First Article Inspection for CNC Machined Parts: A Practical Guide

If you currently have a project or part in your hands that you want to send to a CNC machining parts factory for prototyping production and need quality documents that meet the requirements to control production risks, then the first article inspection is an indispensable step in your parts procurement process.

What Is First Article Inspection (FAI)?

FAI is a verification process carried out before the start of formal mass production. It involves conducting full-scale and full-attribute verification on the first article of the batch of products, and documenting and submitting the results in written form. FAI is not equivalent to simply inspecting the first processed part.

Why Is First Article Inspection Important for CNC Machined Parts?

One characteristic of CNC machining is that getting it right the first time and maintaining consistency throughout the process are two different things. A supplier may be able to produce a seemingly acceptable sample, but they cannot guarantee that the subsequent production process will consistently meet your requirements.

The first article inspection is a verification procedure and an important step in tolerance control. Programming, clamping, tool wear, fixture positioning, material batch, heat treatment deformation, surface treatment thickening – any deviation in any of these variables during mass production will cause the dimensions to gradually fall outside the tolerance range. 

The value of FAI lies in that it fixes these variables and verifies them once before a formal mass production, preventing any deviations from occurring.

When Is First Article Inspection Required?

Not every order needs to undergo the full FAI process, but the following seven situations basically fall within the category. You can directly compare them with the project at hand.

New CNC Part or New Part Number

This is the most standard FAI scenario. Any part that is entering mass production for the first time should undergo a complete first article inspection.

New CNC Supplier or Manufacturing Source

If you transfer an existing part from supplier A to supplier B, even if the drawing remains unchanged, the manufacturing process may still change. The FAI inspection process for each supplier is not exactly the same.

Different suppliers may use different CNC equipments, different tools, different processing parameters, different programming procedures, and different inspection equipment.

Engineering Drawing Revision

If there are any changes to your drawings, whether a full FAI inspection is required depends on which dimensions have been modified. The common practice in the industry is to conduct Delta FAI (local first article inspection). 

Whether a complete FAI is necessary should be determined based on your product requirements or the specific requirements of your customers.

Experienced Engineer Team

Material or Specification Change

Different materials and different grades have differences in machining performance, surface condition and tolerance performance. If your material changes from aluminum alloy 6061 to 7075, it is recommended that you do the entire FAI process.

Manufacturing Process Change

Changing machining from three-axis to five-axis machines and replacing manual deburring with vibration grinding. These changes will have an insidious impact on your parts. For critical parts, re-performing the first article inspection can reduce the quality risks brought about by process changes.

Production Restart After a Long Interruption

If you conduct production restart after a long interruption, then the problems might occur:

  • the machine tools might have been recalibrated
  • the cutting tools might have been replaced with different batches
  • the operators might have changed
  • the tooling might have slight rust or deformation

At this point, reconfirming the key product characteristics can help you reduce the quality risks after resuming production.

Customer-Specific FAI Requirements

All of the above are general rules. The final decision will be based on the customer’s contract, purchase order or quality agreement.

CNC First Article Inspection Process: Step by Step

An effective CNC first article inspection does not start from the moment of inspection. The qualified parts should be produced rather than inspected. Therefore, every step is crucial. Only when the first article meets the relevant requirements, can the subsequent mass production proceed, which usually can reduce the risks of batch rework and scrap.

Review the Drawing and Production Requirements

Before processing, you need to ensure that the supplier can correctly understand your 2D and 3D drawings, dimensions and tolerances, GD&T, surface roughness, threads, special processes and inspection requirements.

Manufacture the First Article Under Production Conditions

Don’t optimize the program or manually repair just to make the first article looks passed. This kind of report is false – it doesn’t prove your mass production capability, but rather your remedial ability. 

Yecheng cnc wallet

A truly qualified first article should be naturally produced under normal processes. If the first one didn’t pass inspection, the correct approach is to analyze the cause, correct the process, and make another one.

Inspect, Document, and Review the Results

After CNC machining, the supplier should do inspection based on your requirements. For critical sizes and complex GD&T features, you need to confirm whether the inspection methods are sufficient to support the corresponding precision requirements. The final product inspection document will be output finally.

Prepare the FAI Documentation

After the inspection is completed, the results need to be organized into a FAI file that meets the requirements of your project. If you need an AS9102 FAI, you also need to prepare the corresponding forms and records according to the specific requirements.

Customer Review and Production Release

If your project requires approval from the client, after submitting the FAI file, you can make confirmations based on your client’s feedback. If any issues are identified, such as critical dimensions not meeting the requirements, you can carry out the following before mass production:

  • Process adjustment
  • Tool adjustment
  • Program modification
  • Fixture adjustment
  • DFM optimization
  • Reprocessing of the first article

What Is Included in a First Article Inspection Report?

The specific content of the FAI report may vary depending on your project, industry and quality standards. However, typically, an FAI inspection report usually consists of the following parts.

Part and Drawing Information

Corresponding to the report, you should provide your part number and the relevant drawing information. This is to ensure that the parts in this FAI report are those provided by the supplier to you, and to avoid confusion during the quality inspection of the parts.

Material, Process, and Supporting Documentation

According to your request, the FAI report may need to include:

  • Material certificate
  • Heat treatment records
  • Surface treatment records
  • Plating / anodizing documentation
  • Special process certificates
  • Certificate of Conformance

If your parts require special materials or special processing, it is best to specify these requirements during the quotation stage. This way, the supplier can provide detailed information according to your needs.

Dimensional and Other Inspection Results

This is the core part of the FAI report. Usually, it is necessary to match the key features in the drawings with the actual measurement results. This way, you can directly determine whether each feature meets the requirements.

FAI vs. Other Manufacturing Inspections: What Is the Difference?

 

InspectionWhenMain PurposeScope
First Article Inspection (FAI)For a new part, new supplier, or significant changeVerify that the first article and relevant production requirements are metTypically comprehensive
First-Piece InspectionAt the start of production, after a setup change, or when changing production linesConfirm the machine setup and first-piece conditionTypically focused on key dimensions
Routine / In-Process InspectionDuring productionMonitor process stability and identify deviations earlyBased on the inspection or control plan
Final InspectionBefore shipmentConfirm that finished parts meet the drawing, order, and quality requirementsFinal product requirements

What Is the Difference Between FAI and First-Piece Inspection?

First-piece inspection is generally a production setup check performed at the beginning of a run. It confirms that the machine, tooling and setup are producing acceptable parts. FAI is broader. It documents the verification of specified product characteristics and provides objective evidence that the intended manufacturing process can produce the required part.

FAQ

What Is an FAI Report?

FAI Report is a quality document used to record the verification results of the first product.

Does FAI Need to Be Approved Before Production?

This depends on your requirements. If you specifically request FAI approval, then you usually need to complete the review or approval process before commencing mass production. This way, your supplier can start mass production as soon as possible.

Does Every New Part Require FAI?

Not necessarily. If the part is a very simple or basic standard component, usually the FAI process can be simplified through mutual negotiation between the two parties. For all new parts, new suppliers, revision of drawings, changes in materials or processes, and resumption of production after a long period of suspension, these should all be carried out.

How Many Parts Are Needed for FAI?

Typically, the FAI inspection is conducted by taking one piece from the first batch of formal production to complete the full FAI process. This is also the baseline requirement of AS9102. However, many customers will request three or five pieces to observe consistency.

What Happens if a Component Passes or Fails the FAI?

If the first article passes the inspection, the supplier can proceed to the subsequent production according to the project requirements or wait for your formal approval later. If the first article fails, then your supplier will need to adjust the production process and so on to re-manufacture until it meets your requirements.

How Does First Article Inspection Improve Quality Control? 

The core value of FAI lies in exposing problems as early as possible before the mass production process begins. If you discover that a key dimension of the first part cannot consistently meet the requirements, then you only need to address the issues during the first article stage. Essentially, FAI is a form of pre-emptive quality risk control.

What Is AS9102 and How Does It Relate to FAI?

AS9102 is the first inspection standard issued by the International Aerospace Quality Group (IAQG). If you require the implementation of FAI in accordance with AS9102, then the supplier needs to prepare FAI documents that meet the requirements based on the corresponding version of the standard.

What are AS9102 Forms 1, 2, and 3?

AS9102 FAI typically consists of three main forms:

  • Form 1 — Part Number Accountability
  • Form 2 — Product Accountability
  • Form 3 — Characteristic Accountability

and used to match the features in the engineering drawings with the actual inspection results.

What Is the Difference Between PPAP and FAI?

Both FAI and PPAP are used for quality verification, but they are not the same system. FAI focuses on full-size and full-function verification of the first article, which is a single-point verification; PPAP is the production part approval program in the automotive industry. Besides the first-piece data, it also requires process flow diagrams, PFMEA, control plans, MSA, initial process capability (Ppk), laboratory qualifications, etc., and is the approval of the entire production system.

Yecheng CNC Milling Machining Pin Fin Heat Sink

Final Thoughts